Bechtel PJET (December 2013/2014)

  • Location: Gladstone, QLD
  • Principal Contractor: Bechtel Australia Pty Ltd
PROJEM’S SCOPE – 8 Technicians Full Time
Supply of Equipment and Technicians to reface damaged flanges before they were sent to the gas projects for Santos, APLNG and QCLNG
  • Machining Blinds up to 2mtrs in diameter to achieve ASME standard raised face finish.
  • Machining special seals in batches of 100 to suit high pressure valves for the three LNG Projects.
  • Flange facing of damaged faces as required workshop/onsite up to 1800mm diameter, both raised face and ring type joint flanges.

Skills

Posted on

18/07/2020